Ref.No: | 63148200 |
Start date: | 01.02.2005 |
End date: | 31.03.2007 |
Approval date: | 22.12.2004 |
Department: | NAVAL ARCHITECTURE & MARINE ENGINEERING |
Sector: | SHIP DESIGN AND MARITIME TRANSPORT |
Financier: | INTEGRATING & STRENGTHENING THE ERA, E.C. |
Budget: | 827.600,00 € |
Scientific Responsible: | PAPANIKOLAOU |
Email: | papa@deslab.naval.ntua.gr |
Description: | AN OFFSHORE FLOATING LNG STORAGE TERMINAL IS PROPOSED IN WHICH A LARGE HULL IS MOORED TO THE SEABED BY MEANS OF A TURRET MOORING SYSTEM THAT ALLOWS THE TERMINAL TO WEATHER-VANE FREELY IN ACCORDANCE WITH THE PREVAILING WEATHER CONDITIONS. ............ |