CENTAVROS: UPGRADE OF GREEN ENERGY POTENTIAL CAPACITY AND WINDWARD BREAKWATER AT THE PORT OF VOLOS

Ref.No: 63249700
Start date: 11.11.2022
End date: 31.12.2024
Approval date: 11.11.2022
Department: NAVAL ARCHITECTURE & MARINE ENGINEERING
Sector: SHIP DESIGN AND MARITIME TRANSPORT
Financier: CEF (CONNECTING EUROPE FACILITY), E.C.
Budget: 178.500,00 €
Public key: 641Σ46ΨΖΣ4-ΑΒΣ
Scientific Responsible: Assoc. Prof. LYRIDIS
Email: dsvlr@central.ntua.gr
Description: THE PROJECT ADDRESSES STUDIES FOR THE DEPLOYMENT OF SHORE-SIDE ELECTRICITY SUPPLY, THE PRODUCTION OF ELECTRICITY BY WAVE ENERGY AND THE SAFETY UPGRADE OF THE WINDWARD BREAKWATER AT THE MARITIME PORT OF VOLOS, WHICH IS LOCATED ON THE COMPREHENSIVE NETWORK