PROTECTION OF THE SEA FRONT FROM THE PORT OF LIMASSOL TO OROKLINI IN CYPRUS

Ref.No: 63175800
Start date: 31.08.2009
End date: 31.12.2013
Approval date: 12.06.2009
Department: CIVIL ENGINEERING
Sector: WATER RESOURCES AND ENVIRONMENTAL ENGINEERING
Financier: UPOURGEIO SUGKOINONION KAI ERGON KUPROU
Budget: 335.170,00 €
Scientific Responsible: KONSTANTINOS MOUTZOURIS
Email: lhwmout@central.ntua.gr
Description: FIELD DATA WILL BE COLLECTED (BATHYMETRY, SEDIMENT,GEOTECHNICAL, ETC). A PHYSICAL MODEL OF THE COAST WILL BE BUILT IN A WAVE BASIN OF THE LABORATORY OF HARBOUR WORKS,NTUA. THE NECESSARY COASTAL STRUCTURES FOR PROTECTION WILL BE STUDIED.