ASSESSMENT OF CONTAMINATION AND PRELIMINARY DESIGN OF REMEDIATION MEASURES IN AN OPERATION SITE OF THE INSTALLATIONS OF HELLENIC DEFENCE SYSTEMS S.A.

Ref.No: 91010000
Start date: 15.12.2021
End date: 30.05.2022
Approval date: 13.12.2021
Department: MINING AND METALLURGICAL ENGINEERING
Sector: METALLURGY AND MATERIALS TECHNOLOGY
Financier: ELLINIKA AMUNTIKA SUSTIMATA AVEE
Budget: 29.897,64 €
Public key: 9Π9Ρ46ΨΖΣ4-6ΟΒ
Scientific Responsible: Prof. PAPASIOPI
Email: papasiop@metal.ntua.gr
Description: AIM OF THE PROJECT IS THE ASSESSMENT OF SOIL AND GROUNWATER CONTAMINATION RELATED WITH THE OPERATION OF A MINES DESTUCTION UNIT IN EAS/LCF INSTALLATIONS. SPECIFIC OBJECTIVES OF THE PROJECT INCLUDE (A) DETAILED INVESTIGATION AND DELIMITATION OF SOIL PO
Go to Top