Ref.No: | 62416600 |
Start date: | 19.07.2023 |
End date: | 18.04.2024 |
Approval date: | 14.07.2023 |
Department: | NAVAL ARCHITECTURE & MARINE ENGINEERING |
Sector: | MARINE ENGINEERING |
Financier: | DIAXEIRISTHS ELLHNIKOY DIKTYOY DIANOMHS HLEKTRIKHS ENERGEIAS AE |
Budget: | 37.200,00 € |
Public key: | ΨΑ8Χ46ΨΖΣ4-ΘΩ9 |
Scientific Responsible: | Prof. PROUSALIDIS |
Email: | jprousal@central.ntua.gr |
Description: | THE OBJECTIVE OF THIS PROJECT IS THE INVESTIGATION OF THE DEVELOPMENT PERSPECTIVES OF THE PORT OF THESSALONIKI IN VIEW OF THE NEW DIRECTIVES OF EU AS A RESULTS OF THE GREEN DEAL. THE PORTS APPLYING THE SHIP-TO-SHORE INTERCONNECTION TECHNOLOGY HOSTING AND BERTHING SHIPS BESIDES TRANSPORT HUBS THEY ARE TO BE TRANSFORMED INTO ENERGY HUBS WITH ELECTRICAL INSTALLATIONS OF FEW MVA'S. TO THIS END A SIGNIFICANT UPGRADE OF THEIR SUBSTATIONS AND THEIR DISTRIBUTION NETWORKS WILL BE REQUIRED. WITHIN THIS CONTEXT, NTUA WILL ASSIST HEDNO TO THE DEVELOPMENT PLAN OF ITS NETWORKS IN THE BROADER AREA OF THE PORTS |