AIGION PORT. ASSESSMENT OF THE PORT STRUCTURES RESPONCE DURING THE CONSTUCTION PERIOD.

Ref.No: 62189200
Start date: 10.12.2004
End date: 09.03.2005
Approval date: 04.03.2005
Department: CIVIL ENGINEERING
Sector: WATER RESOURCES AND ENVIRONMENTAL ENGINEERING
Financier: PERIFEREIAKO TAMEIO ANAPTUXIS (&DEKE) PERIFEREIAS DUT. ELLAD
Budget: 11.700,00 €
Scientific Responsible: Lecturer SAMPSON AZORAKOS
Email: azor@otenet.gr
Description: THE AIGION PORT STRUCTURES RELEVANCE WILL BE EVALUATED AND THE POSSIBILITY OF WORKS COMLETION WILL BE ESTIMATED. FOR THIS PURPOSE, THE WORKS WILL BE INSPECTED AND WILL BE REVIEWED ALONG WITH THE DATA GIVEN BY THE SERVICE.
Go to Top