Ref.No: | 63265800 |
Start date: | 13.11.2024 |
End date: | 30.09.2028 |
Approval date: | 13.11.2024 |
Department: | NAVAL ARCHITECTURE & MARINE ENGINEERING |
Sector: | SHIP DESIGN AND MARITIME TRANSPORT |
Financier: | CEF (CONNECTING EUROPE FACILITY), E.C. |
Budget: | 178.500,00 € |
Public key: | ΨΗ0Ρ46ΨΖΣ4-ΜΑ7 |
Scientific Responsible: | Prof. LYRIDIS |
Email: | dsvlr@central.ntua.gr |
Description: | THE PROJECT CONCERNS CONSTRUCTION WORKS FOR THE INSTALLATION OF FOUR SHORE-SIDE ELECTRICITY (SSE) BERTHING POSITIONS IN THE PORT OF RAFINA AND STUDIES FOR FUTURE SSE IMPLEMENTATION IN THE PORTS OF CORFU, KAVALA AND LAVRIO. THE BERTHING POSITIONS IN THE PORT OF RAFINA WILL SERVE PASSENGER AND FREIGHT VESSELS, WHILE THE STUDIES FOR THE PORTS OF CORFU, KAVALA AND LAVRION COVER PASSENGER, FREIGHT AND CRUISE VESSEL POSITIONS. THUS THE FOUR PORTS WILL OBDAIN A GREENER FOOTPRINT AND TECHNOLOGICALLY ADVANCED EMISSION-FREE OPERATIONS WITH ENHANCED EFFICIENCY, UPGRADED AND OPTIMISED ENERGY NETWORKS CONTRIBUTING TO THE DECARBONISATION OF TRANSPORT SYSTEMS AND QUALITY OF SERVICES ENSURING ENVIRONMENTAL SUSTAINABILITY. THE NTUA WILL DEAL WITH THE EVALUATION OF THE FUNCTIONALITY OF THE SOLUTIONS, THE ENVIRONMENTAL ASSESSMENTS, THE ECONOMIC AND TECHNICAL STUDIES AND WILL PROVIDE CONSULTING SERVICES FOR THE COST-BENEFIT CALCULATION AS WELL AS THE ADVICING FOR THE INDIVIDUAL CONSTRUCTIONS. ALL FOUR PORTS ARE ON THE INTEGRATED TEN-T NETWORK AND WILL BE IN LINE WITH THE EU GREEN DEAL AND THE SUSTAINABLE AND SMART MOBILITY STRATEGY. |