Ref.No: | 91016700 |
Start date: | 28.12.2023 |
End date: | 27.03.2024 |
Approval date: | 15.12.2023 |
Department: | CHEMICAL ENGINEERING |
Sector: | MATERIALS SCIENCE AND ENGINEERING |
Financier: | OSE A.E. (ORGANISMOS SIDIRODROMON ELLADOS A.E.) |
Budget: | 36.939,04 € |
Public key: | 9ΥΥΕ46ΨΖΣ4-ΓΘ9 |
Scientific Responsible: | MOROPOULOU |
Email: | twniamoropoulou@gmail.com |
Description: | PHASE A: PILOT PHASE OF MEASUREMENTS A PILOT PHASE OF ON-SITE MEASUREMENTS ON RAILS AND IN THE LABORATORY ON SAMPLES THAT WILL BE PROVIDED TO TO THE NTUA BY OSE, CORRESPONDING TO TYPICAL WEAR AND FAILURE CATEGORIES THAT WILL ALLOW THE IDENTIFICATION OF THE PHENOMENA, THEIR INTENSITY AND THE EXTENT OF WEAR UP TO THE LEVEL OF CRACKS INITIATION AND FAILURES, TO DETERMINE APPROPRIATE WEAR WARNING INDICATORS AND INDICATORS FOR THE PREVENTIVE MAINTENANCE AS WELL AS THE CORRESPONDINFG RISK THRESHOLDS. IN PARTICULAR, THE PROJECT CONSISTS OF 1. EVALUATION OF REFERENCE DATA AND FIELD RESEARCH TO DETERMINE PILOT POSITIONS FOR MEASUREMENTS AND SAMPLING 2. FIELD WORK AND SAMPLING |