Ref.No: | 62417800 |
Start date: | 06.09.2023 |
End date: | 05.07.2025 |
Approval date: | 06.09.2023 |
Department: | CIVIL ENGINEERING |
Sector: | TRANSPORTATION PLANNING AND ENGINEERING |
Financier: | KOINOPRAKSIA ABAKS AE-MYTILHNAIOS AE |
Budget: | 37.200,00 € |
Public key: | ΨΨ1Ε46ΨΖΣ4-6Χ1 |
Scientific Responsible: | Assist. Prof. STERGIOS MAUROMATIS |
Email: | stemavro@central.ntua.gr |
Description: | THE PROJECT CONCERNS THE ROAD SAFETY AUDIT (RSA) AT THE WORK ZONE AREAS WITHIN THE TRAFFIC SPACE OF THE PRIMARY ROOD NETWORK OF THE PROJECT: UPGRADING OF EASTERN INNER THESSALONIKI RING ROAD WITH PPP. FOR EACH TRAFFIC DEVIATIONS DESIGN DURING THE CONSTRUCTION PHASES OF THE PROJECT, THE CORRESPONDING RSA REPORT WILL BE DELIVERED, WITH THE MAIN OBJECTIVES TO IDENTIFY AREAS THAT MAY RAISE SAFETY CONCERNS AND PROVIDE RECOMMENDATIONS FOR ANY CORRECTIVE INTERVENTIONS REQUIRED. |