INVESTIGATION OF DEVELOPMENT OF THE NETWORKS OF HEDNO WHICH SUPPLY THE INSTALLATION OF THE PORTS OF PATRA AND KERKYRA

Ref.No: 62426100
Start date: 17.05.2024
End date: 16.11.2024
Approval date: 15.05.2024
Department: NAVAL ARCHITECTURE & MARINE ENGINEERING
Sector: MARINE ENGINEERING
Financier: DIAXEIRISTHS ELLHNIKOY DIKTYOY DIANOMHS HLEKTRIKHS ENERGEIAS AE
Budget: 37.076,00 €
Public key: 9Χ1Λ46ΨΖΣ4-Μ48
Scientific Responsible: Prof. PROUSALIDIS
Email: jprousal@central.ntua.gr
Description: THE OBJECTIVE OF THIS PROJECT IS THE INVESTIGATION OF THE DEVELOPMENT PERSPECTIVES OF THE PORTS OF CORFU AND PATRAS IN VIEW OF THE NEW DIRECTIVES OF EU AS A RESULTS OF THE GREEN DEAL. THE PORTS APPLYING THE SHIP-TO-SHORE INTERCONNECTION TECHNOLOGY HOSTING AND BERTHING SHIPS BESIDES TRANSPORT HUBS THEY ARE TO BE TRANSFORMED INTO ENERGY HUBS WITH ELECTRICAL INSTALLATIONS OF FEW MVA'S. TO THIS END A SIGNIFICANT UPGRADE OF THEIR SUBSTATIONS AND THEIR DISTRIBUTION NETWORKS WILL BE REQUIRED. WITHIN THIS CONTEXT, NTUA WILL ASSIST HEDNO TO THE DEVELOPMENT PLAN OF ITS NETWORKS IN THE BROADER AREA OF THE PORTS
Go to Top