Ref.No: | 62113401 |
Start date: | 07.09.2000 |
End date: | 31.12.2010 |
Approval date: | 19.09.2000 |
Department: | CIVIL ENGINEERING |
Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
Financier: | O.L.P. |
Budget: | 69.258,99 € |
Scientific Responsible: | KONSTANTINOS MOUTZOURIS |
Email: | lhwmout@central.ntua.gr |
Description: | THE NEW CONTAINER TERMINAL III OF THE PORT OF PIRAEUS WILL BE STUDIED ON A PHYSICAL MODEL IN THE LABORATORY OF HARBOUR WORKS. WAVE PENETRATION AND SHIP MOTION WILL BE STUDIED. |