PRIMARY ENERGY SUBSTITUTION BY INTEGRATION OF A WASTE INCINERATION INTO AN EXISTING COAL FIRED POWER STATION AS A HYBRID PLANT CONFIGURATION

Ref.No: 63115900
Start date: 01.01.2000
End date: 31.03.2004
Approval date: 01.06.2000
Department: MECHANICAL ENGINEERING
Sector: THERMAL ENGINEERING
Financier: ENERGY ENVIRONMENT AND SUSTAINABLE DEVOLPMENT, E.C.
Budget: 180.000,00 €
Scientific Responsible: Prof. KAKARAS
Email: ekak@central.ntua.gr
Description: DEVELOPMENT OF A HYBRID SYSTEM,WHICH COMPRISES THE COMBINING OF NEW AND RENEWABLE ENERGY SOURCES (WASTES) WITH A CONVENTIONAL SYSTEM (FOSSIL FIRED POWER-STATION) MAKING THE NEW ENERGY SOURCE MORE EFFICIENT, REDUCING FOSSIL ENERGY ....