PRIMARY ENERGY SUBSTITUTION BY INTERGRATION OF A WASTE INCINERATION INTO AN EXISTING COAL FIRED POWER STATION AS A HYBRID PLANT CONFIGURATION

Ref.No: 67036302
Start date: 01.01.2000
End date: 31.12.2009
Approval date: 21.01.2004
Department: MECHANICAL ENGINEERING
Sector: THERMAL ENGINEERING
Financier: ΕΘΝΙΚΗ ΣΥΜΜΕΤΟΧΗ 2003, GGET / ETHNIKI SUMMETOHI
Budget: 4.569,49 €
Scientific Responsible: Prof. KAKARAS
Email: ekak@central.ntua.gr
Go to Top