PROTECTION OF TUNNEL SUPPORT MEASURES AGAINST FIRE

Ref.No: 68108600
Start date: 01.11.2010
End date: 31.08.2013
Approval date: 08.06.2011
Department: MINING AND METALLURGICAL ENGINEERING
Sector: MINING ENGINEERING
Financier: ΕΣΠΑ 2007-2013, UPOURGEIO PAIDEIAS DVM & THRISKEUMATON
Budget: 46.250,00 €
Scientific Responsible: Prof. SOFIANOS
Email: sofianos@metal.ntua.gr
Description: THIS PROJECT IS FOCUSED ON THE PROTECTION OF TUNNEL SUPPORT MEASURES AGAINST FIRE.THE DESTRUCTION OF THE TUNNEL SUPPORT MEASURES DUE TO HIGH TEMPERATURES,DEVELOPED DURING A FIRE WILL BE INVESTIGATED. THE EXISTING METHODS OF PASSIVE FIRE PROTECTION IN...
Go to Top